The definitions institutional counterparties use when discussing US grid and infrastructure intelligence.

Available Transfer Capability

ATC

Transmission

The transfer capability remaining in the physical transmission network for further commercial activity over and above already committed uses.

Base Residual Auction

BRA

Capacity Markets

PJM's primary capacity auction, conducted three years in advance of the delivery year to procure capacity commitments.

Capacity Interconnection Rights

CIR

Interconnection

Rights that permit a generator to participate in PJM's capacity market with a Capacity Resource designation.

Definitive Planning Phase

DPP

Interconnection

MISO's cluster-based interconnection study process replacing serial queue analysis.

Energy Reliability Service

ERIS

Interconnection

Interconnection service that allows a generator to deliver energy as available, without capacity rights.

Energy-Only Market

Market Design

Market design (used by ERCOT) where generators are compensated solely through energy and ancillary services prices, with no separate capacity payment.

Generic Transmission Constraint

GTC

Transmission

ERCOT term for a transmission limitation modeled at an aggregate level rather than a single line, often binding in import-constrained regions.

Integrated Resource Plan

IRP

Utility Planning

Long-range utility plan filed with the regulator describing how the utility will meet forecast demand.

Locational Marginal Price

LMP

Market Design

The marginal cost of supplying the next increment of energy at a specific grid location, reflecting energy, congestion, and losses.

Long Range Transmission Plan

LRTP

Transmission

MISO's multi-tranche regional transmission expansion plan; Tranches 1 and 2 represent the largest combined US transmission build cycle in history.

Network Integration Transmission Service

NITS

Transmission

Transmission service used by network customers to integrate, plan, and deliver bundled retail load.

Network Resource Interconnection Service

NRIS

Interconnection

Higher-tier interconnection service that supports capacity-resource designation in markets that recognize it.

Operating Reserve Demand Curve

ORDC

Market Design

ERCOT scarcity pricing mechanism that adjusts the energy price upward as operating reserves tighten.

Performance Credit Mechanism

PCM

Market Design

Proposed ERCOT reliability construct that would compensate generators for performance during scarcity hours.

Planning Reserve Margin

PRM

Reliability

The amount of generation capacity above forecast peak demand a system must hold to meet reliability standards.

Power Purchase Agreement

PPA

Procurement

Long-term contract for the sale of electricity, typically used by renewable developers and corporate offtakers.

Regional Transmission Expansion Plan

RTEP

Transmission

PJM's annual transmission expansion plan identifying needed system upgrades.

Resource Adequacy Auction

PRA

Capacity Markets

MISO's seasonal capacity auction process used to ensure adequate generation across each season of the planning year.

Time-to-Energization

Operations

The realistic elapsed time from site control to the point at which a load or generator can begin operating against grid supply.

Transmission Owner

TO

Transmission

An entity that owns, operates, or controls transmission facilities and recovers costs through FERC-regulated tariffs.